Success Stories
Ministry of Foreign Affairs of the Republic
Project to consolidate legacy storage systems into one EMC2 Clariion CX4 -120c system (Year 2010-2013)
Entel
Construction and adaptation of 130 sites (technical rooms) outdoor and indoor (Radiobases) that house Cisco, Huawei and Ericsson equipment. Project that includes air conditioning, power, racks and cabling at each site.
Petrobras
Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).
ITC Group
HUS - 110 storage system of 25 TB distributed in high performance and high capacity disks with automatic Tiering (Year 2013)
Blue Express
Equipment for branch connectivity, migration services and platform renovations (Year 2016)
CRE
Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)