Success Stories
Municipal Government of Santa Cruz
Design and Adequacy of Data Center and Monitoring Center with 2200 cameras, 95 autonomous monitoring centers, a central monitoring center, which includes redundant modular UPS, Air Precision, Access Control, Blades Servers, Storage Equipment and Storage Libraries, with availability time of 7 x 24 x 365. (Year 2016/2017)
ITC
Implementation of the second phase of the most reliable and robust private data center in the country (to date with 100% uptime in all its systems) with a capacity of 80 racks, 2(N+1) energy and thermal redundancy (N+1 in each room), high levels of security, transfer to the new power plant without interruption of service and maintaining operation 7x24x365, operators' room, policies, processes and procedures (Year 2016-2017)
Directorate-General for Statistics, Surveys and Census
Storage solution with two EMC2 VNXe3150 (Year 2014-2018)
Ministry of the Interior - National Police
Project to consolidate legacy storage systems into one EMC2 Clariion CX4 -120c system (Year 2010-2013)
Entel
Construction and adaptation of 130 sites (technical rooms) outdoor and indoor (Radiobases) that house Cisco, Huawei and Ericsson equipment. Project that includes air conditioning, power, racks and cabling at each site.
Nuevatel
Creation and total design of the first massive National Metro Ethernet IP/MPLS transport network for IP & TDM multiservices (Emulating Circuits) with 350 access nodes nationwide (Year 2011).