Municipal Government of Santa Cruz

Design and Adequacy of Data Center and Monitoring Center with 2200 cameras, 95 autonomous monitoring centers, a central monitoring center, which includes redundant modular UPS, Air Precision, Access Control, Blades Servers, Storage Equipment and Storage Libraries, with availability time of 7 x 24 x 365. (Year 2016/2017)

ITC

Implementation of the second phase of the most reliable and robust private data center in the country (to date with 100% uptime in all its systems) with a capacity of 80 racks, 2(N+1) energy and thermal redundancy (N+1 in each room), high levels of security, transfer to the new power plant without interruption of service and maintaining operation 7x24x365, operators' room, policies, processes and procedures (Year 2016-2017)

Entel

Construction and adaptation of 130 sites (technical rooms) outdoor and indoor (Radiobases) that house Cisco, Huawei and Ericsson equipment. Project that includes air conditioning, power, racks and cabling at each site.

Nuevatel

Creation and total design of the first massive National Metro Ethernet IP/MPLS transport network for IP & TDM multiservices (Emulating Circuits) with 350 access nodes nationwide (Year 2011).

Bolivia

ITC Group logo

Santa Cruz

La Paz

Cochabamba