Implementation and Full design of the first massive National IP/MPLS Carrier Ethernet transport network for IP multiservices with 100 access nodes nationwide (Year 2010).

Similar projects

Nuevatel

Construction and adaptation of 300 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2009-2013)

ITC

Implementation of the second phase of the most reliable and robust private data center in the country (to date with 100% uptime in all its systems) with a capacity of 80 racks, 2(N+1) energy and thermal redundancy (N+1 in each room), high levels of security, transfer to the new power plant without interruption of service and maintaining operation 7x24x365, operators' room, policies, processes and procedures (Year 2016-2017)

Entel

Construction and adaptation of 130 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2009-2012)

Cotas

Implementation of the first new generation CMTS nodes (cBr-8) simplifying the traditional CMTS model to a future CCAP (Year 2016).

Municipal Government of Santa Cruz

Design and Adequacy of Data Center and Monitoring Center with 2200 cameras, 95 autonomous monitoring centers, a central monitoring center, which includes redundant modular UPS, Air Precision, Access Control, Blades Servers, Storage Equipment and Storage Libraries, with availability time of 7 x 24 x 365. (Year 2016/2017)

Entel

Expansion of the Metro Ethernet Network (IP-NGN) in 150 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2014 - 2015)