Entel

Construction and adaptation of 130 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2009-2012)

Similar projects

Entel

Full implementation and design of the first massive National Carrier Ethernet IP/MPLS Transport Network for multi-services IP with 100 access nodes at national level (Year 2010)

Nuevatel

Creation and total design of the first massive National Metro Ethernet IP/MPLS transport network for IP & TDM multiservices (Emulating Circuits) with 350 access nodes nationwide (Year 2011).

Entel

Expansion of the Metro Ethernet Network (IP-NGN) in 150 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2014 - 2015)

Cotas

Implementation of the first new generation CMTS nodes (cBr-8) simplifying the traditional CMTS model to a future CCAP (Year 2016).

Nuevatel

Construction and adaptation of 300 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2009-2013)

ITC

Implementation of the second phase of the most reliable and robust private data center in the country (to date with 100% uptime in all its systems) with a capacity of 80 racks, 2(N+1) energy and thermal redundancy (N+1 in each room), high levels of security, transfer to the new power plant without interruption of service and maintaining operation 7x24x365, operators' room, policies, processes and procedures (Year 2016-2017)

Bolivia