Millicom International

Administration, Management in the Operation and Maintenance of the Main Datacenter of Tigo Bolivia and Paraguay, service that includes the Monitoring of all the infrastructure of the Datacenter, Measurements of energy, climatization, security, Supervision of suppliers for facilities, preventive and corrective maintenance, Maintenance of the technical documentation of the Datacenter, development and fulfillment of processes and certifiable methodology Uptime Institute in the sustainable operation of the Datacenter (Year 2018-2019)

Similar projects

YPFB Andina

Design, provision and installation of its Datacenter infrastructure to house high heat and energy density equipment (blades) in a very small space, which complies with the TIA-942 Tier II standard (Year 2012).

Entel

Construction and adaptation of 130 sites (technical rooms) outdoor and indoor (Radiobases) that house Cisco, Huawei and Ericsson equipment. Project that includes air conditioning, power, racks and cabling at each site.

TIVIT

Professional Services for the implementation of a DELL EMC Unity 400 and SAN Switches system (Year 2018- 2021)

Secretary of State for Taxation (SET)

BID PROFOMAF II 240 BR-PR PROJECT of Consultancy for the Adaptation of the Current Data Center and Design of a New Data Center for the SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the "Telecommunications Industry Association" (TIA-942), ISO 14000, ISO 17799/27001 and BCI ("Business Continuity Institute") standards and complying with "Tier III" standards. (Year 2013)

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).

Bolivia

ITC Group logo

Santa Cruz

La Paz

Cochabamba