Nuevatel

Construction of 350 sites (Technical Rooms) in 9 phases, including cooling, power, fiber and copper cabling, rack mounting, power regulation, up to switch configuration (Year 2013 -2016)

Similar projects

Entel

Construction and adaptation of 130 sites (technical rooms) outdoor and indoor (Radiobases) that house Cisco, Huawei and Ericsson equipment. Project that includes air conditioning, power, racks and cabling at each site.

Banco Mercantil Santa Cruz

Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented into Equipment, Network, UPS, Power, NOC, Test and Supplier rooms. Includes a Precision N+1 Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)

Municipal Government of Santa Cruz

Design and Adequacy of Data Center and Monitoring Center with 2200 cameras, 95 autonomous monitoring centers, a central monitoring center, which includes redundant modular UPS, Air Precision, Access Control, Blades Servers, Storage Equipment and Storage Libraries, with availability time of 7 x 24 x 365. (Year 2016/2017)

National Tax Service

Design, assembly and adaptation of a "Tier III" Datacenter in two Phases of 120KVA each, segmented in Equipment, Networking, UPS, Power, NOC, Test Room and Suppliers rooms. Includes a N+1 Precision Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020).

Millicom International

Administration, Management in the Operation and Maintenance of the Main Datacenter of Tigo Bolivia and Paraguay, service that includes the Monitoring of all the infrastructure of the Datacenter, Measurements of energy, climatization, security, Supervision of suppliers for facilities, preventive and corrective maintenance, Maintenance of the technical documentation of the Datacenter, development and fulfillment of processes and certifiable methodology Uptime Institute in the sustainable operation of the Datacenter (Year 2018-2019)

YPFB Corporation

Consulting, Design, Construction and Implementation of the Data Center for the new VPNO building. Analysis, studies, design and assembly of a Datacenter with capacity for 8 Racks and complying with the "Tier III" standard of the TIA-942, implementing modular, scalable and hot maintainable UPS, own redundant power generation, N+1 air conditioning system, access control, corridor containment and fire system (Year 2015 - 2016).

Bolivia