Banco Mercantil Santa Cruz

Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented in Equipment, Networks, UPS, Energy, NOC, Test Room and Suppliers. Suppliers. It includes an N+1 Precision Cooling system for each room with Redundant Chillers and with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)

Similar projects

Petrobras

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).

Union Bank

Design, assembly, construction and adaptation of a Datacenter "hot" with capacity for 10 Racks, 2 air inrows, 2 UPS with autonomy of 8 hours, false floor, hot aisle containment, fire system and other subsystems for compliance with the standard "Tier II" (Year 2013-2014).

National Tax Service

Design, assembly and adaptation of a "Tier III" Datacenter in two Phases of 120KVA each, segmented in Equipment, Networking, UPS, Power, NOC, Test Room and Suppliers rooms. Includes a N+1 Precision Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020).

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Millicom International

Administration, Management in the Operation and Maintenance of the Main Datacenter of Tigo Bolivia and Paraguay, service that includes the Monitoring of all the infrastructure of the Datacenter, Measurements of energy, climatization, security, Supervision of suppliers for facilities, preventive and corrective maintenance, Maintenance of the technical documentation of the Datacenter, development and fulfillment of processes and certifiable methodology Uptime Institute in the sustainable operation of the Datacenter (Year 2018-2019)

YPFB Corporation

Consulting, Design, Construction and Implementation of the Data Center for the new VPNO building. Analysis, studies, design and assembly of a Datacenter with capacity for 8 Racks and complying with the "Tier III" standard of the TIA-942, implementing modular, scalable and hot maintainable UPS, own redundant power generation, N+1 air conditioning system, access control, corridor containment and fire system (Year 2015 - 2016).

Bolivia

ITC Group logo

Santa Cruz

La Paz

Cochabamba