Design, assembly, construction and adaptation of a Datacenter "hot" with capacity for 10 Racks, 2 air inrows, 2 UPS with autonomy of 8 hours, false floor, hot aisle containment, fire system and other subsystems for compliance with the standard "Tier II" (Year 2013-2014).
![](https://itc-e.com/wp-content/uploads/2019/07/DC-22-300x160.jpg)
Entel
Construction and adaptation of 130 sites (technical rooms) outdoor and indoor (Radiobases) that house Cisco, Huawei and Ericsson equipment. Project that includes air conditioning, power, racks and cabling at each site.