Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).

Similar projects

ITC

Implementation of the second phase of the most reliable and robust private data center in the country (to date with 100% uptime in all its systems) with a capacity of 80 racks, 2(N+1) energy and thermal redundancy (N+1 in each room), high levels of security, transfer to the new power plant without interruption of service and maintaining operation 7x24x365, operators' room, policies, processes and procedures (Year 2016-2017)

Millicom International

Administration, Management in the Operation and Maintenance of the Main Datacenter of Tigo Bolivia and Paraguay, service that includes the Monitoring of all the infrastructure of the Datacenter, Measurements of energy, climatization, security, Supervision of suppliers for facilities, preventive and corrective maintenance, Maintenance of the technical documentation of the Datacenter, development and fulfillment of processes and certifiable methodology Uptime Institute in the sustainable operation of the Datacenter (Year 2018-2019)

National Tax Service

Design, assembly and adaptation of a "Tier III" Datacenter in two Phases of 120KVA each, segmented in Equipment, Networking, UPS, Power, NOC, Test Room and Suppliers rooms. Includes a N+1 Precision Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020).

Secretary of State for Taxation (SET)

BID PROFOMAF II 240 BR-PR PROJECT of Consultancy for the Adaptation of the Current Data Center and Design of a New Data Center for the SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the "Telecommunications Industry Association" (TIA-942), ISO 14000, ISO 17799/27001 and BCI ("Business Continuity Institute") standards and complying with "Tier III" standards. (Year 2013)

DGIC Ministry of Finance

Investment project study consultancy for the construction of a data centre for the Ministry of Finance of the Government of Paraguay. Analysis, studies, design and assembly of a 1000 mts2 Datacenter complying with the "Telecommunications Industry Association" standard (TIA-942), ISO 14000, ISO 17799/27001 and the BCI ("Business Continuity Institute") standard and complying with the "Tier III" standard (Year 2012)

Municipal Government of Santa Cruz

Design and Adequacy of Data Center and Monitoring Center with 2200 cameras, 95 autonomous monitoring centers, a central monitoring center, which includes redundant modular UPS, Air Precision, Access Control, Blades Servers, Storage Equipment and Storage Libraries, with availability time of 7 x 24 x 365. (Year 2016/2017)

Bolivia

ITC Group logo

Santa Cruz

La Paz

Cochabamba