Success Stories
Berkemeyer Law Firm
EMC2 VNXe3100 Appliance Storage Solution (Year 2010-2014)
Entel
G200 VSP storage equipment for Entel's IP Services Division that went on to replace two EMC Clariion storage systems (Year 2017)
Office of the Comptroller General of the Republic
Storage Solutions, Capacity Expansion, Backup and Recovery (Year 2015-2020)
Petrobras
Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).
Union Bank
Design, assembly, construction and adaptation of a Datacenter "hot" with capacity for 10 Racks, 2 air inrows, 2 UPS with autonomy of 8 hours, false floor, hot aisle containment, fire system and other subsystems for compliance with the standard "Tier II" (Year 2013-2014).
Entel
Full implementation and design of the first massive National Carrier Ethernet IP/MPLS Transport Network for multi-services IP with 100 access nodes at national level (Year 2010)