Entel

Full implementation and design of the first massive National Carrier Ethernet IP/MPLS Transport Network for multi-services IP with 100 access nodes at national level (Year 2010)

Entel

Expansion of the Metro Ethernet Network (IP-NGN) in 150 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2014 - 2015)

National Tax Service

HUS-VM High End Enterprise Storage System Upgrade with New Generation FMD 4TB Flash Disks to enable Oracle Database Process Acceleration (Year 2016)

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Secretary of State for Taxation (SET)

BID PROFOMAF II 240 BR-PR PROJECT of Consultancy for the Adaptation of the Current Data Center and Design of a New Data Center for the SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the "Telecommunications Industry Association" (TIA-942), ISO 14000, ISO 17799/27001 and BCI ("Business Continuity Institute") standards and complying with "Tier III" standards. (Year 2013)

Bolivia

ITC Group logo

Santa Cruz

La Paz

Cochabamba