Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented in Equipment, Networks, UPS, Energy, NOC, Test Room and Suppliers. Suppliers. It includes an N+1 Precision Cooling system for each room with Redundant Chillers and with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)
Petrobras
Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).