DGIC Ministry of Finance

Investment project study consultancy for the construction of a data centre for the Ministry of Finance of the Government of Paraguay. Analysis, studies, design and assembly of a 1000 mts2 Datacenter complying with the "Telecommunications Industry Association" standard (TIA-942), ISO 14000, ISO 17799/27001 and the BCI ("Business Continuity Institute") standard and complying with the "Tier III" standard (Year 2012)

Similar projects

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Secretary of State for Taxation (SET)

BID PROFOMAF II 240 BR-PR PROJECT of Consultancy for the Adaptation of the Current Data Center and Design of a New Data Center for the SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the "Telecommunications Industry Association" (TIA-942), ISO 14000, ISO 17799/27001 and BCI ("Business Continuity Institute") standards and complying with "Tier III" standards. (Year 2013)

Citibank

Professional 24/7 On-site Support Services and Multiplatform Backup and Recovery System in Virtual Libraries with Online Deduplication and Compression (Year 2010-2018)

Entel

Construction and adaptation of 130 sites (technical rooms) outdoor and indoor (Radiobases) that house Cisco, Huawei and Ericsson equipment. Project that includes air conditioning, power, racks and cabling at each site.

YPFB Corporation

Consulting, Design, Construction and Implementation of the Data Center for the new VPNO building. Analysis, studies, design and assembly of a Datacenter with capacity for 8 Racks and complying with the "Tier III" standard of the TIA-942, implementing modular, scalable and hot maintainable UPS, own redundant power generation, N+1 air conditioning system, access control, corridor containment and fire system (Year 2015 - 2016).

Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).

Bolivia