Success Stories
![](https://itc-e.com/wp-content/uploads/2019/07/CE-MC01.jpg)
Bank of the Oriental Republic of Uruguay
Sale and Support on site of SUN M25000 Servers and Storage for the implementation of the new Core Banking (Year 2008-2010)
![](https://itc-e.com/wp-content/uploads/2019/07/Mision-Critica-300x199.jpg)
Office of the Comptroller General of the Republic
Storage Solutions, Capacity Expansion, Backup and Recovery (Year 2015-2020)
![](https://itc-e.com/wp-content/uploads/2019/07/Redes-300x199.jpg)
Entel
Full implementation and design of the first massive National Carrier Ethernet IP/MPLS Transport Network for multi-services IP with 100 access nodes at national level (Year 2010)
![](https://itc-e.com/wp-content/uploads/2019/07/DC-20-300x165.jpg)
Secretary of State for Taxation (SET)
BID PROFOMAF II 240 BR-PR PROJECT of Consultancy for the Adaptation of the Current Data Center and Design of a New Data Center for the SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the "Telecommunications Industry Association" (TIA-942), ISO 14000, ISO 17799/27001 and BCI ("Business Continuity Institute") standards and complying with "Tier III" standards. (Year 2013)
![](https://itc-e.com/wp-content/uploads/2019/07/DC-14-300x200.jpg)
Union Bank
Design, assembly, construction and adaptation of a Datacenter "hot" with capacity for 10 Racks, 2 air inrows, 2 UPS with autonomy of 8 hours, false floor, hot aisle containment, fire system and other subsystems for compliance with the standard "Tier II" (Year 2013-2014).
![](https://itc-e.com/wp-content/uploads/2019/07/Mision-Critica-300x199.jpg)
Municipal Government of Santa Cruz
HUS 130 Midrange Storage System with 300 TB available (Year 2014)