Success Stories
Office of the Comptroller General of the Republic
Storage Solutions, Capacity Expansion, Backup and Recovery (Year 2015-2020)
CRE
Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)
Nuevatel
Construction and adaptation of 300 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2009-2013)
YPFB Andina
Design, provision and installation of its Datacenter infrastructure to house high heat and energy density equipment (blades) in a very small space, which complies with the TIA-942 Tier II standard (Year 2012).
Mosaic International
Next Generation Threat Prevention Appliance, Wired Security Teams, including Professional Services and Collaborative Standard Support (Year 2016)
Municipal Government of Santa Cruz
HUS 130 Midrange Storage System with 300 TB available (Year 2014)