Construction of 350 sites (Technical Rooms) in 9 phases, including cooling, power, fiber and copper cabling, rack mounting, power regulation, up to switch configuration (Year 2013 -2016)
![](https://itc-e.com/wp-content/uploads/2019/07/DC-17-300x106.jpg)
Petrobras
Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).