Secretary of State for Taxation (SET)

BID PROFOMAF II 240 BR-PR PROJECT of Consultancy for the Adaptation of the Current Data Center and Design of a New Data Center for the SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the "Telecommunications Industry Association" (TIA-942), ISO 14000, ISO 17799/27001 and BCI ("Business Continuity Institute") standards and complying with "Tier III" standards. (Year 2013)

Similar projects

Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

National Tax Service

Design, assembly and adaptation of a "Tier III" Datacenter in two Phases of 120KVA each, segmented in Equipment, Networking, UPS, Power, NOC, Test Room and Suppliers rooms. Includes a N+1 Precision Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020).

YPFB Andina

Design, provision and installation of its Datacenter infrastructure to house high heat and energy density equipment (blades) in a very small space, which complies with the TIA-942 Tier II standard (Year 2012).

Nuevatel

Construction of 350 sites (Technical Rooms) in 9 phases, including cooling, power, fiber and copper cabling, rack mounting, power regulation, up to switch configuration (Year 2013 -2016)

Banco Mercantil Santa Cruz

Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented into Equipment, Network, UPS, Power, NOC, Test and Supplier rooms. Includes a Precision N+1 Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)

Bolivia