YPFB Andina

Design, provision and installation of its Datacenter infrastructure to house high heat and energy density equipment (blades) in a very small space, which complies with the TIA-942 Tier II standard (Year 2012).

Similar projects

Secretary of State for Taxation (SET)

BID PROFOMAF II 240 BR-PR PROJECT of Consultancy for the Adaptation of the Current Data Center and Design of a New Data Center for the SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the "Telecommunications Industry Association" (TIA-942), ISO 14000, ISO 17799/27001 and BCI ("Business Continuity Institute") standards and complying with "Tier III" standards. (Year 2013)

Petrobras

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Banco Mercantil Santa Cruz

Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented into Equipment, Network, UPS, Power, NOC, Test and Supplier rooms. Includes a Precision N+1 Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)

ITC

Implementation of the second phase of the most reliable and robust private data center in the country (to date with 100% uptime in all its systems) with a capacity of 80 racks, 2(N+1) energy and thermal redundancy (N+1 in each room), high levels of security, transfer to the new power plant without interruption of service and maintaining operation 7x24x365, operators' room, policies, processes and procedures (Year 2016-2017)

Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).

Bolivia

ITC Group logo

Santa Cruz

La Paz

Cochabamba