HUS - 110 storage system of 25 TB distributed in high performance and high capacity disks with automatic Tiering (Year 2013)
Entel
Full implementation and design of the first massive National Carrier Ethernet IP/MPLS Transport Network for multi-services IP with 100 access nodes at national level (Year 2010)
Enel
Sandblast as Appliance and Sandblast Agent on more than 300 Endpoints (Year 2017)
Social Welfare Institute of the Republic
Corporate storage solution for PACS medical diagnostic imaging platform (Year 2013-2018)
Petrobras
Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).
YPFB Corporation
Consulting, Design, Construction and Implementation of the Data Center for the new VPNO building. Analysis, studies, design and assembly of a Datacenter with capacity for 8 Racks and complying with the "Tier III" standard of the TIA-942, implementing modular, scalable and hot maintainable UPS, own redundant power generation, N+1 air conditioning system, access control, corridor containment and fire system (Year 2015 - 2016).