Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).

Nuevatel

Construction and adaptation of 300 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2009-2013)

Central Bank of the Republic

Project to consolidate legacy storage systems into two EMC2 VNX 5200 systems replicated to two data centers (Year 2018-2021)

Bolivia