National Tax Service

Design, assembly and adaptation of a "Tier III" Datacenter in two Phases of 120KVA each, segmented in Equipment, Networking, UPS, Power, NOC, Test Room and Suppliers rooms. Includes a N+1 Precision Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020).

Linkser

First Hitachi VSP G200 Block Storage System integrated over a Fibre Channel SAN to Cisco Servers with Microsoft Hyper (Year 2017)

Enel

Sandblast as Appliance and Sandblast Agent on more than 300 Endpoints (Year 2017)

Banco Mercantil Santa Cruz

Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented into Equipment, Network, UPS, Power, NOC, Test and Supplier rooms. Includes a Precision N+1 Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)

Entel

Second Renewal of Preventive and Corrective Support Service for VSP High End Unified Storage System with SAN / NAS for Entel (Year 2018)