Success Stories
National Tax Service
Design, assembly and adaptation of a "Tier III" Datacenter in two Phases of 120KVA each, segmented in Equipment, Networking, UPS, Power, NOC, Test Room and Suppliers rooms. Includes a N+1 Precision Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020).
Ministry of Industry and Trade
Check Point DDoS system for the mitigation of attacks on the transaction and professional services portal (Year 2017)
Office of the Comptroller General of the Republic
Storage Solutions, Capacity Expansion, Backup and Recovery (Year 2015-2020)
DGIC Ministry of Finance
Investment project study consultancy for the construction of a data centre for the Ministry of Finance of the Government of Paraguay. Analysis, studies, design and assembly of a 1000 mts2 Datacenter complying with the "Telecommunications Industry Association" standard (TIA-942), ISO 14000, ISO 17799/27001 and the BCI ("Business Continuity Institute") standard and complying with the "Tier III" standard (Year 2012)
National Police Identification Department
EMC2 VNX5400 Enterprise Storage Solution (Year 2014-2018)
CRE
Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)