Petrobras
![](https://itc-e.com/wp-content/uploads/2019/07/DC-17.jpg)
Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).
YPFB Andina
![](https://itc-e.com/wp-content/uploads/2019/07/DC-16.jpg)
Design, provision and installation of its Datacenter infrastructure to house high heat and energy density equipment (blades) in a very small space, which complies with the TIA-942 Tier II standard (Year 2012).
YPFB Corporation
![](https://itc-e.com/wp-content/uploads/2019/07/DC-15.jpg)
Consulting, Design, Construction and Implementation of the Data Center for the new VPNO building. Analysis, studies, design and assembly of a Datacenter with capacity for 8 Racks and complying with the "Tier III" standard of the TIA-942, implementing modular, scalable and hot maintainable UPS, own redundant power generation, N+1 air conditioning system, control and monitoring of the [...]
Union Bank
![](https://itc-e.com/wp-content/uploads/2019/07/DC-14.jpg)
Design, assembly, construction and adaptation of a Datacenter "hot" with capacity for 10 Racks, 2 air inrows, 2 UPS with autonomy of 8 hours, false floor, hot aisle containment, fire system and other subsystems for compliance with the standard "Tier II" (Year 2013-2014).
Municipal Government of Santa Cruz
![](https://itc-e.com/wp-content/uploads/2019/07/DC-13.jpg)
Design and Adequacy of Data Center and Monitoring Center with 2200 cameras, 95 autonomous monitoring centers, a central monitoring center, which includes redundant modular UPS, Air Precision, Access Control, Blades Servers, Storage Equipment and Storage Libraries, with availability time of 7 x 24 x 365. (Year 2016/2017)
ITC
![](https://itc-e.com/wp-content/uploads/2019/07/DC-01.jpg)
Implementation of the second phase of the most reliable and robust private data center in the country (to date with 100% uptime in all its systems) and with a capacity of 80 racks, 2(N+1) and thermal redundancy (N+1 in each room), high security levels, transfer to the new power plant without interruption [...].