Success Stories
Central Bank of the Republic
Project to consolidate legacy storage systems into two EMC2 VNX 5200 systems replicated to two data centers (Year 2018-2021)
Telis
VSP G200 storage system on a mix of high performance and high capacity disks, connected to Cisco UCS servers and a VMWare environment (Year 2018)
Repsol
Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).
Banco Mercantil Santa Cruz
Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented into Equipment, Network, UPS, Power, NOC, Test and Supplier rooms. Includes a Precision N+1 Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)
Municipal Government of Santa Cruz
HUS 130 Midrange Storage System with 300 TB available (Year 2014)
Hertz Rent-a-Car
Perimeter security platform, support services, administration and monitoring (Year 2017)